University Commons EIR

Print
Press Enter to show all options, press Tab go to next option

Draft Environmental Impact Report
0_Cover Volume I
0_TOC
1_Introduction
2_Executive Summary
3_Project Description 
4.0_Introduction to the Analysis 
4.1_Air Quality
4.2_Greenhouse Gas Emissions and Energy
4.3_Land Use and Planning 
4.4_Noise
4.5_Public Services and Utilities
4.6_Transportation and Circulation 
5_Statutorily Required Sections
6_Alternatives Analysis 
7_EIR Authors and Persons Consulted 
8_References

DEIR Appendices
0_Cover Volume II
Appendix A_SACOG MTP-SCS Consistency Determination
Appendix B_ University Commons Project NOP
Appendix C_University Mall Redevelopment Project IS with Appendices
Appendix D_NOP Comment Letters
Appendix E_Health Risk Assessment Modeling Outputs 
Appendix F_Air Quality_Greenhouse Gas Modeling Outputs
Appendix G_Environmental Noise Assessment
Appendix H_Evaluation of Water Demands
Appendix I_Evaluation of Sewer Flows and Resulting Infrastructure Needs
Appendix J_Transportation Impact Study

Notice of Availability of the Draft EIR and Public Comments
There will be a 45-day public review and comment period on the University Commons Draft EIR beginning on November 6, 2019 and ending on December 20, 2019. All comments on the Draft EIR must be received by the City no later than 5:00 pm on December 20, 2019 to be considered. Pursuant to Section 15088a of the CEQA Guidelines, late comments will be considered only at the City’s discretion. 

Notice of Availability (November 6, 2019)

Notice of Preparation/Initial Study 
A Notice of Preparation of a Draft EIR and an Initial Study were prepared for 30-day public review period beginning November 16, 2018 and ending December 17, 2018 to solicit input and comments from public agencies and the general public on the proposed Draft EIR. A public scoping meeting is scheduled for December 5, 2018 from 5:00 to 7:00 PM in the Senior Center Activity Room.  
Notice of Preparation (November 16, 2018)
Initial Environmental Study (November 2018)