Show/Hide

Theta Xi Redevelopment Project

Print
Press Enter to show all options, press Tab go to next option

503, 509, 515 1st Street

 Elevation-Theta-Xi

Project Plans and Materials 

Updated Site Plan and Elevations (January 2020) 

503, 509 and 515 1st Street Historical Effects Analysis Study (June 2018)
Asbestos Survey 503 1st Street
Asbestos Survey 509 1st Street
Asbestos Survey 515 1st Street
Title Report
Historical Resource Analysis Study (October 2016)
Planning Application
Structural Inspection Report (7/27/2016)
Theta Xi Entitlement (1/3/2018)
Theta Xi Project Narrative (4/25/2018)
Theta Xi Zoning Standards (4/23/2018)

FINAL EIR
Theta Xi Final EIR March 2020
Theta Xi CEQA Findings of Fact and Statement of Overriding Considerations March 2020


Draft Environmental Impact Report (DEIR). The Draft EIR is available for a 45-day public comment period. See the Notice of Availability and the Draft EIR below for more details. A Planning Commission meeting to review the Draft EIR is scheduled for August 28, 2019. The Historic Resources Management Commission will also review the Draft EIR on August 19, 2019. 

 

Notice of Availability (NOA). A NOA of the Draft EIR for the Theta Xi Project for 45-day public comment period will begin on July 8, 2019 and end on August 28, 2019. 

DRAFT EIR SECTIONS
0.0 Cover Theta Xi Public July 2019
0.0 Executive Summary Theta Xi Public July 2019
0.0 TOC Theta Xi Public July 2019
1.0 Introduction Theta Xi Public July 2019
2.0 Project Description Theta Xi Public July 2019
3.1 Cultural and Tribal Theta Xi Public July 2019
3.2 Land Use Theta Xi Public July 2019
4.0 Other CEQA Section Theta Xi Public July 2019
5.0 Alternatives Theta Xi Public July 2019
6.0 Report Preparers Public July 2019
7.0 References Theta Xi Public July 2019
Appendix A IS, NOP, and NOP Comments
Appendix B Historical Effects Analysis Study 2018
Appendix C Historical Resource Analysis Study 2016
Theta Xi Public Draft EIR with Appendices July 2019
Theta Xi Public Draft EIR July 2019