Davis Fire Department Fee Schedule

Effective July 1, 2008

Construction Plan Review
(plan review and final inspection)
25% of Building Dept.
plan check fee
Fire Protection System Plan Review/Inspection
  • Kitchen hood system/Special Systems
    (plan review and one inspection)
$ 304.00
  • Fire Dept sprinkler/hydrant line
    (inspection, hydrostatic test and flush test)
458.00
  • Sprinkler water flow data collection
    (water flow test and calculation of data)
304.00
  • Sprinkler system
    (see Fire Prevention Bureau for definition of a system)
  • 0 - 200 sprinklers
533.00
  • 201 + sprinklers
(plan review, hydrostatic test, rough-in & final inspection)
683.00
  • Residential fire sprinklers
    (plan review, rough-in & final inspection)
446.00
  • Fire alarm system
    (plan review, rough-in inspection and final inspection)
458.00
Engine Company Initial Inspection
40.00
Fire Prevention Reinspection
(after initial engine company inspection)
80.00
Fire Code Permit Inspection
  • Fireworks display, public
    (correspondence and 2 inspections)
458.00
  • Open flame use
    (one inspection)
154.00
  • Flammable or combustible liquid tank removal, underground
    (plan review and 1 inspection)
304.00
  • Flammable/combustible liquid tank installation, underground
    (plan review and 1 inspection)
304.00
  • Tent or temporary membrane structure, erect or operate
    (plan review and one inspection)
304.00
  • Model rocket use (waived for academic groups)
    (correspondence and 1 inspection)
154.00
Fire Safety Inspection
(inspection of occupancies regulated by social services and health services – one inspection)
154.00
Special Review/Additional Inspection - per incident
(used at the discretion of the Fire Marshal for situations not covered above)
154.00
Fire Reports – Sale of fire reports (per copy)
22.00
Photographs – Copies of photographs – Cost + 15% Administrative Overhead
TBD

City of Davis, California
23 Russell Blvd.
Davis, Ca. 95616